Close Menu
  • World
  • Business
  • Auto
  • Sports
  • Entertainment
  • National
  • Career
  • Utility
  • Lifestyle
  • Tech
What's Hot

Sarfaraz Khan competed with Virat Kohli as soon as Team India was out, it was difficult to identify!

July 21, 2025

Husband Imad Wasim cheated Sania, left his wife for this girl!

July 21, 2025

After Afghanistan, now this team will train in India, sweat for 15 days to win this ICC tournament

July 21, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter)
News NCRNews NCR
Subscribe
  • World
  • Business
  • Auto
  • Sports
  • Entertainment
  • National
  • Career
  • Utility
  • Lifestyle
  • Tech
News NCRNews NCR
Lucknow-Kanpur Rapid Rail Corridor to Cut Travel Time to 50 Minutes, DPR Work Begins
National

Lucknow-Kanpur Rapid Rail Corridor to Cut Travel Time to 50 Minutes, DPR Work Begins

Damini SharmaBy Damini SharmaJuly 6, 2025Updated:July 6, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Reddit
Lucknow-Kanpur Rapid Rail Corridor to Cut Travel Time to 50 Minutes, DPR Work Begins
Share
Facebook Twitter LinkedIn Pinterest Email

In a move that could significantly transform intercity connectivity in Uttar Pradesh, the Uttar Pradesh Housing Department has initiated efforts to develop a high-speed Rapid Rail Corridor between Lucknow and Kanpur, inspired by the successful Delhi-Ghaziabad-Meerut RRTS model.

The department has directed the Uttar Pradesh Metro Rail Corporation (UPMRC) and the Unnao-Shuklaganj Development Authority to begin preparing a Detailed Project Report (DPR). This report will assess the technical and financial viability of the proposed corridor and outline the route, estimated cost, and expected ridership. Once completed and approved, the project aims to reduce the current nearly two-hour travel time to just 50 minutes.

Central Government Support Likely

The central government is expected to provide financial support for this ambitious project, which is being touted as a major step toward building a modern, fast, and safe mass transport system across key urban hubs in the state.

However, the project will move to the execution phase only after receiving in-principle approval from the Uttar Pradesh state government. Following approval, a private consultancy will be selected through a tendering process to develop the DPR in detail.

Proposed Route and Integration with Metro Network

As per initial proposals, the rapid rail corridor will span 67 kilometres, beginning at Naya Ganj in Kanpur and ending at Amausi in Lucknow. Both terminal points are strategically chosen due to their proximity to existing metro networks, ensuring smooth multi-modal connectivity for daily commuters.

Parallel Expressway Also in Progress

In addition to the proposed rapid rail line, a six-lane expressway between Lucknow and Kanpur is currently under development. This 63-km-long expressway will pass through Bani, Kantha, and Amarsas, ending at Azad Marg in Kanpur. The expressway is expected to further boost regional mobility and provide an alternative high-speed option for travelers.

Transforming Urban Mobility in UP

The rapid rail and expressway projects together reflect a growing focus on infrastructure-led development in Uttar Pradesh. If both projects are completed on schedule, they are likely to enhance daily commuting, stimulate economic activity, and improve the overall quality of life for millions of people in the region.

Lucknow
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Damini Sharma

Experienced Senior Content Writer with a demonstrated history of working in the information technology and services industry. Skilled in SEO Copywriting, Web Content Writing, Storytelling, Blogging, and Social Media. Strong media and communication professional with a mass communication focused in Journalism from Sjmc davv indore.

Related Posts

Viral Video: Wife Asks High IQ Question From Husband, He Cleverly Gets To Have a Cup of Tea Like THIS

July 20, 2025

Pahalgam Terror Attack a Preplanned Pakistani Army, Political Establishment Conspiracy, Pak Did THIS For Secrecy

July 15, 2025

20 secret cellar, training from Maulana in Dubai, printing books and spreading hatred; What was going on in Chhangur's devilish mind?

July 15, 2025
Our Picks

Actor and producer Dheeraj Kumar passed away, last breath at the age of 79, was battling pneumonia

July 15, 2025

Deepika Padukone will remain free! If she knew how many hours Shweta Tiwari shifted to become 'inspiration'?

July 15, 2025

This company of Anil Ambani doubled in a year, will be seen more now!

July 15, 2025

Sourav Ganguly's biopic will be delayed due to 800 crores actor! Because of this, the shooting of the film postponed

July 15, 2025
Don't Miss
Sports

Sarfaraz Khan competed with Virat Kohli as soon as Team India was out, it was difficult to identify!

By EditorialJuly 21, 20250

Sarfaraz Khan lost weight. (Photo- PTI/Instagram) Despite making a Test debut against England in 2024,…

Sports

Husband Imad Wasim cheated Sania, left his wife for this girl!

By EditorialJuly 21, 20250

Imad Wasim cheated wife Sania! (Pc-insstagram) Imad Wasim is in the headlines at the moment…

Sports

After Afghanistan, now this team will train in India, sweat for 15 days to win this ICC tournament

By EditorialJuly 21, 20250

To do training in India (photo: matthew lewis -ecc/ICC via getty images) Everyone is aware…

Sports

The player who hit 313 runs showed this charisma after 16 years, the fourth player of the country made 6 sixes

By EditorialJuly 21, 20250

Mitchell Oven scored half -century (photo: Getty images) Australia won the first T20 match by…

News NCR
Facebook X (Twitter) Instagram Pinterest
  • About us
  • Contact
  • Privacy Policy
  • Disclaimer

MASHABLE IS A GLOBAL, MULTI-PLATFORM MEDIA AND ENTERTAINMENT COMPANY. FOR MORE QUERIES AND NEWS CONTACT US ON THIS EMAIL: INFO@MASHABLEPARTNERS.COM


© 2025 News NCR. All Rights Reserved.

Type above and press Enter to search. Press Esc to cancel.